+ Reply to Thread
Page 4 of 4 FirstFirst ... 234
Results 46 to 52 of 52

Thread: South Endzone Construction Photos

  1. #46
    Administrator qng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond repute qng001's Avatar
    Join Date
    Sep 2002
    Location
    Little Rock, AR
    Posts
    19,248

    Re: South Endzone Construction Photos

    Quote Originally Posted by GermDawg View Post
    Get the recent Tech/NFL guys to put together the 500k, Milsap did the video board in the TAC, we have how many in the NFL right now?
    A half-million seems pretty steep. The entire TAC video/score board project (including four panel LED displays, two ribbon boards, two floor displays and two scoreboards) cost $1.2 million.

  2. #47
    Champ RhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond repute RhythmDawg's Avatar
    Join Date
    Jan 2007
    Location
    Ruston, LA
    Posts
    6,114

    Re: South Endzone Construction Photos

    Quote Originally Posted by qng001 View Post
    A half-million seems pretty steep. The entire TAC video/score board project (including four panel LED displays, two ribbon boards, two floor displays and two scoreboards) cost $1.2 million.
    I'm assuming it would be 160-180 feet in length. Perhaps that is raising the cost above what you might expect.

  3. #48
    Administrator qng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond reputeqng001 has a reputation beyond repute qng001's Avatar
    Join Date
    Sep 2002
    Location
    Little Rock, AR
    Posts
    19,248

    Re: South Endzone Construction Photos

    Looking around online, Arkansas installed two 100 ft LED ribbon boards to their baseball stadium with a project cost of $340,000. I just think the estimate cost of $500k that you heard sounds a bit inflated. I don't know. Could be including the cost of running cables, utilities, etc. Also, I thought we were going to have the production room in the new SEZ, unless that was nixed.

  4. #49
    Champ techman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond repute
    Join Date
    Apr 2007
    Location
    Ruston
    Posts
    17,576

    Re: South Endzone Construction Photos

    Would make sense that something that small could be operated from the endzone, regardless of where the big board controls are located.

  5. #50
    Champ techman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond reputetechman05 has a reputation beyond repute
    Join Date
    Apr 2007
    Location
    Ruston
    Posts
    17,576

    Re: South Endzone Construction Photos

    I guess you would then have 2 crews or at least 2 people running things from 2 different spots. We already mess up what we have. Never mind, bad idea.

  6. #51
    Champ GermDawg has a reputation beyond reputeGermDawg has a reputation beyond reputeGermDawg has a reputation beyond reputeGermDawg has a reputation beyond reputeGermDawg has a reputation beyond reputeGermDawg has a reputation beyond reputeGermDawg has a reputation beyond reputeGermDawg has a reputation beyond reputeGermDawg has a reputation beyond reputeGermDawg has a reputation beyond reputeGermDawg has a reputation beyond repute GermDawg's Avatar
    Join Date
    Sep 2002
    Location
    Lafayette
    Posts
    6,900

    Re: South Endzone Construction Photos

    Quote Originally Posted by qng001 View Post
    Looking around online, Arkansas installed two 100 ft LED ribbon boards to their baseball stadium with a project cost of $340,000. I just think the estimate cost of $500k that you heard sounds a bit inflated. I don't know. Could be including the cost of running cables, utilities, etc. Also, I thought we were going to have the production room in the new SEZ, unless that was nixed.
    IFRC the mock ups gave the impression it would be tied into the game states, showing points, down/YTG, time, and play clock. So may have some extra data cabling/programming to tie it in. Who knows, I just hope it's there and operational on Sept 5th.

  7. #52
    Champ RhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond reputeRhythmDawg has a reputation beyond repute RhythmDawg's Avatar
    Join Date
    Jan 2007
    Location
    Ruston, LA
    Posts
    6,114

    Re: South Endzone Construction Photos

    Quote Originally Posted by qng001 View Post
    Looking around online, Arkansas installed two 100 ft LED ribbon boards to their baseball stadium with a project cost of $340,000. I just think the estimate cost of $500k that you heard sounds a bit inflated. I don't know. Could be including the cost of running cables, utilities, etc. Also, I thought we were going to have the production room in the new SEZ, unless that was nixed.
    You are correct. The number I was originally given was inflated. Your number is much closer. It was casual conversation, so I guess I'll give him a pass.

    I suppose it's possible he said 3 and I heard 5.

+ Reply to Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts