Quote Originally Posted by sportdawg View Post
From my understanding, the stadium will move closer to Alabama @ the intersection. I don't know how close they'll be able to build, but should be enough to have the NCAA recommended dimensions.
My point is that temporary bleachers won't be needed if the permanent structure has the 3,000 to 3,500 seats that should be included. And to get that number of seats, the permant structure needs to extend at least as far down both foul lines as past the old visitor bullpen down the first base line.