    Administrator TechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the rough TechDawgFan's Avatar
    Join Date
    May 2002
    Location
    Bossier City, LA
    Posts
    3,729

    Pipeline Construction

    CenterPoint Energy Gas Transmission is going to start construction on a new, 42" diameter high pressure gas transmission line this fall in North Louisiana. It is going to run from Carthage, LA to Delhi, LA. The route takes it south of Shreveport, Bistineau, around Hodge, LA, and on into Delhi.

    The reason I bring this up is that pipelines of this size aren't built just every day and it really is an impressive site to see this type of work if you get the chance. We will be doing a fair number of directional drills and the drill hole is supposed to be around 5 ft. in diameter! I'll try to keep folks informed, but if you get a chance to go out and see some of the equipment they will be using in this project, you ought to take advange of it.

    Also, if you see any trains going through N. LA toward Minden or coming up from Baytown that are loaded with large diameter, red coated (FBE- Fusion Bonded Epoxy) pipe, it is probably ours. The last train I saw was a couple of weeks ago and it stopped in downtown Shreveport on the way through and was stacked 9 double joints per car.

    The overall project is 173 miles with two compressor stations - one near Carthage and another near Vernon.

    Chris

  2. #2
    Super Moderator PawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond repute PawDawg's Avatar
    Join Date
    Sep 2002
    Posts
    57,491

    Re: Pipeline Construction

    I have heard of the project. I'm not sure, but didn't a fellow Dawg here in West Monroe do the surveying for you guys? Is the final tie in with Columbia Gulf?

  3. #3
    Administrator TechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the rough TechDawgFan's Avatar
    Join Date
    May 2002
    Location
    Bossier City, LA
    Posts
    3,729

    Re: Pipeline Construction

    Knowing how much survey work he does for us, I suspect that he did. Jimmy goes to him on every project I've known him to manage and wouldn't expect this one to be any different.

    Per the FERC filing (which is public record), we will be taking gas from Duke Field Services, Houston Pipeline, and Enbridge around Carthage and will be delivering to Texas Gas, Trunkline, and Columbia Gulf on the east end. Most people don't realize just how much gas moves through the pipeline corridor east of Monroe. This project is filed for around 1.3 BCF (that's Billion Cubic Feet per day) and Gulf South is building a competing project along the same route that is also 42".

    This is definitely a booming time for pipeline construction that I haven't seen in my short (10 year) tenure in the industry. In addition to these projects, there is going to be another 42" line built by SOMEBODY from around the termination of our project to Mobile and CenterPoint and Duke have announced open season (what's the interest) in a 1,600 mile 42" project from around Midland, TX to western Pennsylvania! It is my understanding that the mills are all booked for close to 3 years and companies are having to go to Greece and India for pipe and the Ukrane for plate!

    For an industry that has had so much pressure in downsizing for so many years, this is truly an exciting time!

    Chris

  4. #4
    Administrator TechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the rough TechDawgFan's Avatar
    Join Date
    May 2002
    Location
    Bossier City, LA
    Posts
    3,729

    Re: Pipeline Construction

    Looks like we'll be the ones building the extension as well.

    Southeast Supply Header Signs Anchor Shipper

    For more information, contact:
    CenterPoint Energy: Leticia Lowe, 713.207.7702
    DEGT: Gretchen Krueger, 713.627.4072
    Southeast Supply Header Signs Anchor Shipper
    CenterPoint Energy & Duke Energy Gas Transmission Continue Developing Pipeline
    HOUSTON – Aug. 23, 2006 – Southeast Supply Header, LLC, has signed an agreement with Florida Power and Light Company (FPL) for firm transportation service on its proposed pipeline that will bring natural gas from east Texas and north Louisiana to growing U.S. markets.

    The agreement subscribes approximately half of the planned 1 billion cubic feet per day capacity on the proposed Southeast Supply Header pipeline, which is expected to be in service in June 2008.

    The agreement is contingent upon a decision by the Florida Public Service Commission for FPL to recover the costs it will incur under the agreement. That approval is expected in the fall of this year.

    During an open season held earlier this year, a number of other shippers expressed interest in the project. Southeast Supply Header, LLC, is continuing discussions with other interested shippers for the remaining capacity on the pipeline.

    The Southeast Supply Header is a joint venture between subsidiaries of CenterPoint Energy, Inc. (NYSE: CNP) and Duke Energy Gas Transmission (DEGT). The 270-mile, 36-inch diameter pipeline will extend from the Perryville Hub in northeast Louisiana, which is owned by CenterPoint Energy’s subsidiary, CenterPoint Energy Gas Transmission Company, to Gulfstream Natural Gas System, which is 50 percent owned by an affiliate of DEGT. Along the route, the Southeast Supply Header will access several major pipelines serving the eastern United States and have access to several storage facilities.

    “We are pleased to have FPL anchoring the Southeast Supply Header,” said Cy Zebot, chief commercial officer of CenterPoint Energy’s pipelines group. “The level of FPL’s commitment is essential to achieving the scale needed to support the capital investment required by such a project. We believe that FPL and its customers will benefit from the supply diversity and flexibility that this project will provide.”

    “This pipeline will help manage the growing appetite for natural gas in Florida by providing access to natural gas onshore production from Texas and Louisiana, by significantly increasing natural gas deliverability into both pipelines that serve a majority of Florida, and by enhancing supply security and reliability when weather events threaten production in the Gulf of Mexico,” said Terry Morrison, vice president of FPL’s Energy Marketing & Trading division.

    “We are very pleased to have reached this agreement with FPL,” said Guy Buckley, group vice president, DEGT. “The demand for natural gas continues to grow in the Southeast and FPL plays a critical role in serving this region. The Southeast Supply Header will ensure reliable access to growing supply regions through interconnects with major interstate natural gas pipelines and provide supply diversity for southeast and northeastern U.S. markets.”

    In June and July of 2006, Open Houses were held along the pipeline route to introduce the project to local communities and begin the collaborative work necessary to design a route that strikes a balance among affected landowners, the environment and construction requirements.

    The pre-filing process with the Federal Energy Regulatory Commission (FERC) has
    been initiated, and an application is expected to be filed in November. Once the project is approved by FERC, construction is anticipated to begin in the November 2007 timeframe, with an expected in-service date of mid-2008.

    CenterPoint Energy, Inc., headquartered in Houston, Texas, is a domestic energy delivery company that includes electric transmission & distribution, natural gas distribution, competitive natural gas sales and services, and pipeline and field services operations. The company serves more than five million metered customers primarily in Arkansas, Louisiana, Minnesota, Mississippi, Oklahoma and Texas. Assets total approximately $16 billion. Through subsidiaries, it owns and operates CenterPoint Energy Gas Transmission Company and CenterPoint Energy Mississippi River Transmission Corporation interstate gas pipelines. With about 9,000 employees, CenterPoint Energy and its predecessor companies have been in business for more than 130 years. For more information, visit the Web site at www.CenterPointEnergy.com.

    Duke Energy Gas Transmission (DEGT) is a North American leader in the long-haul transportation and storage of natural gas. For more than a half-century, DEGT and its predecessor companies have developed the critically important pipelines and related energy infrastructure that connects natural gas supply sources to premium markets. Based in Houston, Texas, the company's assets include more than 17,500 miles of transmission pipeline and more than 250 billion cubic feet of storage capacity in the U.S. and Canada. DEGT also has natural gas gathering, processing and distribution assets and natural gas liquids operations that are among the largest in Canada. More information can be found at: http://www.degt.duke-energy.com.

    Duke Energy is a diversified energy company with a portfolio of natural gas and electric businesses, both regulated and unregulated, and an affiliated real estate company. Duke Energy supplies, delivers and processes energy for customers in the Americas. Headquartered in Charlotte, N.C., Duke Energy is a Fortune 500 company traded on the New York Stock Exchange under the symbol DUK. More information about the company is available on the Internet at: http://www.duke-energy.com.

    Florida Power & Light Company is the principal subsidiary of FPL Group, Inc. (NYSE: FPL), nationally known as a high quality, efficient and customer-driven organization focused on energy-related products and services. With annual revenues of more than $11 billion and a growing presence in 26 states, FPL Group is widely recognized as one of the country's premier power companies. Florida Power & Light Company serves 4.4 million customer accounts in Florida. FPL Energy, LLC, FPL Group's competitive energy subsidiary is a leader in producing electricity from clean and renewable fuels. Additional information is available on the Internet at www.FPL.com, www.FPLGroup.com and www.FPLEnergy.com.
    This news release includes forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. The statements in this news release regarding future events and other statements that are not historical facts are forward-looking statements. Although CenterPoint Energy and Duke Energy believe that their respective expectations of future events as set forth in this release are based on reasonable assumptions, neither CenterPoint Energy nor Duke Energy can give assurance that anticipated results will be achieved or that anticipated events will occur. Actual events and results may differ materially from those projected. Important factors that could cause actual results to differ materially from those in the forward-looking statements of CenterPoint Energy herein are discussed in CenterPoint Energy's and its subsidiaries Form 10-Ks for the period ended Dec. 31, 2005, and Form 10-Qs for the quarters ended March 31 and June 30, 2006, and other filings with the Securities and Exchange Commission. Important factors that could cause actual results to differ materially from those in the forward-looking statements of Duke Energy herein are discussed in Duke Energy's Form 10-Q for the quarters ended March 31 and June 30, 2006, and other filings with the Securities and Exchange Commission.

  5. #5
    Champ marketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond repute marketdawg's Avatar
    Join Date
    Aug 2005
    Location
    Shreveport
    Posts
    4,805

    Re: Pipeline Construction

    They are putting a new gas line through our property outside of Elm Grove. The flagging goes right by one of my best deer stands. I hope they get it done before season starts!
    “Towie Barclay of the Glen, Happy to the maids, But never to the men.”

  6. #6
    Administrator TechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the roughTechDawgFan is a jewel in the rough TechDawgFan's Avatar
    Join Date
    May 2002
    Location
    Bossier City, LA
    Posts
    3,729

    Re: Pipeline Construction

    If it's ours and it's this project, I apoligize in advance. It won't be done. But think of it this way - you're going to have a clear ROW to shoot down now!

    Chris

  7. #7
    Champ marketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond reputemarketdawg has a reputation beyond repute marketdawg's Avatar
    Join Date
    Aug 2005
    Location
    Shreveport
    Posts
    4,805

    Re: Pipeline Construction

    It's the Roose/McDowell/Feist land and I don't remember the section# but as far as I can see it this is the equation I can extrapolate from this situation....Money+ Good Gravel Roads + Less Dependence On Foreign Oil + Work For Lots Of La. Folks + A Shooting/Planting Row= Do whatever you see fit! My Dad is a geoligist (unfortunately from Kent State, one of the bottom 5 teams in NCAA Div. 1 football..he played college baseball, however). Keep up the good work and "TDF, lay that pipe like we've heard that only you can do!!!!!!!!!!!"
    “Towie Barclay of the Glen, Happy to the maids, But never to the men.”

  8. #8
    Champ Choudawg86 has a reputation beyond reputeChoudawg86 has a reputation beyond reputeChoudawg86 has a reputation beyond reputeChoudawg86 has a reputation beyond reputeChoudawg86 has a reputation beyond reputeChoudawg86 has a reputation beyond reputeChoudawg86 has a reputation beyond reputeChoudawg86 has a reputation beyond reputeChoudawg86 has a reputation beyond reputeChoudawg86 has a reputation beyond reputeChoudawg86 has a reputation beyond repute Choudawg86's Avatar
    Join Date
    Sep 2002
    Location
    Ruston, La.
    Posts
    5,357

    Re: Pipeline Construction

    Quote Originally Posted by maddawg View Post
    I have heard of the project. I'm not sure, but didn't a fellow Dawg here in West Monroe do the surveying for you guys? Is the final tie in with Columbia Gulf?
    Heyyyyyyyyy, I used to work with that guy :icon_wink: Used to hit Peking with him also every friday before game day.


  9. #9
    Puppy BULLMAN63 is a jewel in the roughBULLMAN63 is a jewel in the roughBULLMAN63 is a jewel in the roughBULLMAN63 is a jewel in the roughBULLMAN63 is a jewel in the roughBULLMAN63 is a jewel in the roughBULLMAN63 is a jewel in the roughBULLMAN63 is a jewel in the roughBULLMAN63 is a jewel in the roughBULLMAN63 is a jewel in the roughBULLMAN63 is a jewel in the rough
    Join Date
    Sep 2003
    Location
    DEER PARK, TX
    Posts
    82

    Re: Pipeline Construction

    Do you guys in the pipeline business deal with a Tech grad who was working for Milbar? His name is Layton Bryant. He was from Haughton and was living in S'port last I talked to him. Anyway, ever cross paths with him on the pipeline?

  10. #10
    Puppy Vandal-dawg is an unknown
    Join Date
    Mar 2007
    Posts
    1

    Re: Pipeline Construction

    While you guys are drooling over the Centerpoint Pipeline, 2 more Tech engineers are designing another 500 mile 42-inch OD gas pipeline cruising just north of Ruston right next to ANOTHER big inch pipeline project by another competitor. A third Tech engineer is replacing a crude oil pipeline running to El Dorado from Shreveport.
    Stay blessed!
    Gone pipelinin'-
    Vandal-dawg

  11. #11
    Progressive King of 2011 Dawgpix has a reputation beyond reputeDawgpix has a reputation beyond reputeDawgpix has a reputation beyond reputeDawgpix has a reputation beyond reputeDawgpix has a reputation beyond reputeDawgpix has a reputation beyond reputeDawgpix has a reputation beyond reputeDawgpix has a reputation beyond reputeDawgpix has a reputation beyond reputeDawgpix has a reputation beyond reputeDawgpix has a reputation beyond repute Dawgpix's Avatar
    Join Date
    Sep 2002
    Location
    Western Ouachita Parish
    Posts
    20,295

    Re: Pipeline Construction

    Quote Originally Posted by Choudawg86 View Post
    Heyyyyyyyyy, I used to work with that guy :icon_wink: Used to hit Peking with him also every friday before game day.
    Then he took his ball home when the Saints lost!
    Louisiana Tech University
    Flagship of the University of Louisiana System

  12. #12
    Champ aubunique seems to have something between the earsaubunique seems to have something between the earsaubunique seems to have something between the earsaubunique seems to have something between the earsaubunique seems to have something between the earsaubunique seems to have something between the earsaubunique seems to have something between the ears aubunique's Avatar
    Join Date
    Sep 2002
    Location
    Fayetteville, Arkansas
    Posts
    7,545

    Re: Pipeline Construction

    While you guys are happy to have the work, people off Louisiana 4 are screaming mad about having it go through their forests with little profit to them, not nearly enough for the disruption of their land.

  13. #13
    Super Moderator PawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond reputePawDawg has a reputation beyond repute PawDawg's Avatar
    Join Date
    Sep 2002
    Posts
    57,491

    Re: Pipeline Construction

    Quote Originally Posted by aubunique View Post
    While you guys are happy to have the work, people off Louisiana 4 are screaming mad about having it go through their forests with little profit to them, not nearly enough for the disruption of their land.
    I haven't heard Aub. Who are these people? What are they getting for the right of ways? I'm guessing the people along hwy. 4 who are selling mineral rights aren't upset.