Pictures from October 18th:
photo 1.JPGphoto 2.JPGphoto 3.JPGphoto 2 (2).JPGphoto 3 (2).JPG
![]() |
![]() |
Pictures from October 18th:
photo 1.JPGphoto 2.JPGphoto 3.JPGphoto 2 (2).JPGphoto 3 (2).JPG
From Adam McGuirt on Twitter: https://twitter.com/AdamMcGuirt/stat...15157559074817
Getting read to pour the foundation in at the SEZ Project.
![]()
I wonder, will there be a new visiting team locker room located in the SEZ building or will they have to hike it to the current visiting locker room?
The stadium is going to be FRIGIN loud with that giant wall of glass at the edge of the endzone bouncing sound off of it! I think we are all going to be surprised at how much difference it will make.
Soooo....
We thought it would be awesome to dress the south endzone up as a concrete building slab this morning.
![]()
Thanks for the pictures - hopefully we can see some building going up by the Rice game. How long does that have to set before we can see the building going up?
Steel erection should begin very soon, assuming there are no problems.
Yes I said erection. No I will not give real time period predictions.
Good looking pour
''Don't be a bad dagh..."
Can we sign our initials in the concrete this weekend?
Louisiana Tech University
Flagship of the University of Louisiana System
Pictures of the SEZ project from the 28th and 29th of November:
IMG_1766.jpgIMG_1768.jpgIMG_1771.jpgIMG_1794.jpgIMG_1795.jpg